Development Project Lists


PROJECT NAME & DESCRIPTION

CEQA DOCUMENTS

COMMENT PERIOD / SCHEDULED FOR ACTION

PROJECT STATUS

Galt Ranch Commercial Development 

Application received June 30, 2025 for a Tentative Parcel Map, one Conditional Use Permit (CUP) for five drive-through restaurant uses, one CUP for three freeway-oriented pole signs, one CUP for one convenience market, one Minor Use Permit (MUP) for one car wash, a Master Site Plan, a Master Sign Plan and Design Guidelines. The 45-acre site is zoned Highway Commercial and has a General Plan land use designation of Commercial. 

Refer to the February 12, 2026 agenda packet for project materials.

Refer to the May 19, 2026 City Council agenda packet for project materials (available May 14, 2026).

Modified Initial Study / 15183 Checklist

Planning Commission Public Hearing: February 12, 2026

City Council Appeal Public Hearing: May 19, 2026

Approved by Planning Commission 5-0

Decision appealed to City Council

Maverik Gas Station 

Application received June 3, 2024. The proposed Maverik will be located on a vacant parcel along the future extension of A Street and Crystal Way (APN 150-0082-018). It is the first project application received for the Galt Ranch Commercial Development. Further details are listed below:

5,951 sq. ft. convenience store building
26 gasoline fuel pumps covered by a 19’3” tall canopy
5 commercial fuel islands covered by a 19’3” tall canopy
35 parking spaces
3 underground fuel tanks
2 CAT Scales (large truck scale)
On-site RV sewage dump
New landscaping, lighting, and signage

The proposed land use is considered a ‘Gas Station with a Convenience Market’ per the Galt Municipal Code Commercial Land Use Matrix Table 18.20-1 and is subject to a Conditional Use Permit (CUP) in the HC zone. The gas station itself is a staff level Design Review for project architecture, site design, parking, lighting, and landscaping pending Planning Commission decision of the Galt Ranch Commercial Development. 

The convenience store use will be decided by the Planning Commission on February 12, 2026 while the gas station Design Review is staff-level.

Notice of Exemption N/A (staff level design review) Application pending decision of Galt Ranch Commercial Development.
Simmerhorn Road Truck Fueling Facility 

Application received December 11, 2025 for a high-speed diesel truck fueling facility including a four-bay fuel island with canopy, small equipment/storage kiosk, and trash enclosure. The project will also include paving of the entire site and landscaping. The project is an expansion of the existing 76 gas station directly to the south. Fuel tanks will be placed underground. 

Project approval will be determined by the Community Development Director. 

Notice of Exemption

Staff level design review Application under review.
Lippi Ranch TSM Time Extension

The Lippi Ranch Subdivision Project is an entitled residential development of 94 single-family residences. The project required approval of an Environmental Impact Report (EIR) and adoption of a Mitigation Monitoring and Reporting Program (MMRP), and approval of a General Plan Amendment (GPA), Rezone, Tentative Subdivision Map (TSM), and Design Review (DR). Galt City Council approved the project on December 19, 2023 with a TSM expiration date of December 19, 2025. The applicant applied for a three-year map extension on December 9, 2025 in accordance with Galt Municipal Code 18.64.040.13, wherein upon written request of the subdivider filed prior to expiration of the approved or conditionally approved tentative map, the time at which such map expires may be extended by the Planning Commission in its sole discretion for a period or periods not exceeding a total of three (3) years.

Refer to the January 8, 2026 Planning Commission agenda for project materials.

Notice of Exemption Planning Commission Public Hearing: January 8, 2026 Two-year extension approved by Planning Commission 5-0.
Carillion Corners II

Application received November 14, 2025 for a Tentative Parcel Map, Design Review, Conditional Use Permit, and Minor Use Permit. The application proposes a tentative parcel map to divide the parcel into four separate parcels. Parcel 1 is 1.96± acres to be developed by the applicant at a later date. Parcel 2 is 1.35± acres with a proposed Commercial development which will include the construction of a 3,000 sq. ft. convenience store, 800 sq. ft. retail space, 1,800 sq. ft. fast food restaurant, and fuel facility with a 3,000 sq. ft. car wash. Parcel 3 is 5.98± acres to be developed by the applicant later. Parcel 4 is 2.27± acres and will be sold and developed at a later date. 

The project will be determined by the Planning Commission at a future noticed public hearing. 

Notice of Exemption Planning Commission Public Hearing: TBD Application under review.
Dry Creek West

Application received September 25, 2025 for a General Plan Amendment, Rezone, Tentative Subdivision Map, and Design Review. The application proposes a Commercial / Mixed Use development of approximately 2± acres; a Row Home development of approximately 15± acres to include 160 row homes in 4- and 5-unit buildings; a Senior Apartment (ages 55+) community of approximately 6.07± acres with 68 rental homes in primarily 3-unit single story buildings; and an Assisted Living Facility designated parcel of approximately 4.20± acres (including the detention basin), to be sold and ultimately developed by an assisting living facility operator.

Refer to the April 9, 2026 Planning Commission agenda for project materials. 

Addendum to the 2015 Dry Creek Oaks IS/MND 

Planning Commission Public Hearing:   April 9, 2026

 

City Council Public Hearing:   May 19, 2026

Recommended for approval by Planning Commission 5-0.
Grocery Outlet CUP

Application received October 6, 2025 for a Conditional Use Permit. The applicant proposes to establish a Grocery Outlet in the Carillion Corners shopping center. The existing building at 10570 Twin Cities Road is currently vacant. A Conditional Use Permit (CUP) is required for grocery store uses as well as for the sale of beer, wine, and distilled spirits for off-site consumption in the Commercial zone.  Operating hours will be from 7:00 AM to 10:00 PM daily. Construction activities are limited to interior renovations which may require a tenant improvement permit. 

 Refer to the November 13, 2025 Planning Commission agenda for project materials. 

Notice of Exemption  Planning Commission Public Hearing: November 13, 2025 Approved by Planning Commission 4-0.
Crystal Way Buzz Oates

Application received September 30, 2025 for a Commercial Tentative Parcel Map (TPM) to accommodate a variety of Commercial and Highway Commercial land uses. The application also includes a proposed rezone for a portion of the project site from Highway Commercial to Commercial. 

The project will be determined by the Planning Commission at a future noticed public hearing. 

15183 Modified Initial Study Checklist Planning Commission Public Hearing: TBD Application under review
10769 Boessow Road

Application received July 30, 2025 for a GPA, Rezone, and TSM. The property currently consists of three separate zoning designations: Highway Commercial (approximately 50% of the parcel), R2 (approximately 25% of the parcel), and R1C (approximately 25% of the parcel). The applicant proposes rezoning a portion of the HC-zone to single family residential resulting in a reduction to approximately seven acres of commercially zoned property. The resulting residential portion of the project includes a total of 103 dwelling units within two villages. Village 1 includes 32 lots with a typical lot size of 55’x100’. Village 2 includes 71 lots with a typical lot size of 55’x105’. The average density for the residential portion of the project is approximately 4.9 du/ac.

The project will heard by the Planning Commission at a future noticed public hearing. 

IS/MND

Notice of Public Review Period and Notice of Intent

CEQA public review period: TBD 

Planning Commission Public Hearing: TBD

City Council Public Hearing: TBD

Application under review
Fairway Oaks Design Review

Application received June 9, 2025 for Design Review (Project Architecture). The project consists of floorplans, walls, and fences for 162 single-family lots. 

There will be two different product lines: Cypress and Ironwood. The Ironwood product line offers three (3) floor plans ranging in size from 1,923 square feet to 2,588 square feet. Both one- and two-story floor plans will be offered. Each floor plan will offer three (3) elevation options: Spanish Modern, Craftsman, and Contemporary. Ironwood will be built on 67 lots that are 55 feet wide. Thus, Ironwood is functionally 9 different design options, 3 floor plans in 3 elevation plans. The lots range in size from 5,500 square feet to 14,255 square feet.

The Cypress product line offers four (4) floor plans ranging in size from 2,274 square feet to 3,247 square feet. Both one- and two-story floor plans will be offered. Each floor plan will offer three (3) elevation options: Spanish Modern, Craftsman, and Contemporary. Thus, Cypress is functionally 12 different design options, 4 floor plans in 3 elevation options. The Cypress product line will be built on 95 lots that are 65 feet wide.

In addition to the design review for the project architecture, the Fairway Oaks approved Vesting Tentative Subdivision Map (VTSM) includes a condition that requires review and approval of walls and fences by the Planning Commission.

Refer to the Planning Commission August 14, 2025 agenda packet for more information.

Notice of Exemption Planning Commission Public Hearing: August 14, 2025 Approved by Planning Commission on August 14, 2025 with additional conditions.
Sheffield Subdivision

Application received March 28, 2025 for a 65-lot Tentative Subdivision Map at 13315 E. Stockton Blvd. The minimum lot size proposed is 3,825 square feet. Project entitlements include a GPA from Low Density Residential to Medium-High Residential, a North East Area Specific Plan (NEASP) amendment from R-1-C SP to R2-SP with an increase in density to the R2-SP designation, a Rezone from R1A to R2-PD, and a Tentative Subdivision Map.

Refer to the November 13, 2025 Planning Commission agenda for project materials. 

Refer to the December 2, 2025 City Council agenda packet for more information. 

IS/MND

Appendix A - Air Quality

Appendix B - Biological Resources

Appendix C - Geotech

Appendix D - CAP Checklist

Appendix E - Phase I (Part I)

Appendix E - Phase I (Part II)

Appendix F - Nosie Assessment

Appendix G - Transportation Impact Memo

Notice of Public Review Period and Notice of Intent

 

CEQA public review period: September 19, 2025 - October 20, 2025

Planning Commission Public Hearing: November 13, 2025

City Council Public Hearing: December 2, 2025.

Recommended for approval by Planning Commission 4-0 with two added conditions.

Approved by City Council 4-1.

 

Summerfield at Twin Cities Design Review

Application received March 27, 2025 for Design Review (project architecture). The Summerfield at Twin Cities is a 58-acre residential subdivision that was approved by City Council in 2020. The approved project includes 204 single-family lots. The smallest lot is 6,510 square feet and the largest lot is 12,788 square feet. The design review proposal offers two separate product lines: Cedar Glen and Cedar Grove. Cedar Glen includes five floor plans ranging in size from 2,306 to 3,306 square feet. Cedar Grove includes four floor plans ranging in size from 2,018 to 2,484 square feet. A mix of one- and two-story homes are included in both product lines. 

Refer to the Planning Commission June 12, 2025 agenda packet for more information.

Refer to the City Council September 16, 2025 agenda packet for more information.

Notice of Exemption

Planning Commission Public Hearing: June 12, 2025

City Council Public Hearing (Appeal): September 16, 2025

Application denied by Planning Commission on June 12, 2025.

Appeal filed by applicant on July 1, 2025.

City Council upheld appeal with additional conditions on September 16, 2025.

Spaans Drive Apartments
 

Application received December 30, 2024 for a proposed 37 apartments at 695, 700, 710 and 705 Spaans Drive. 

The proposed type of land use is considered a ‘Multiple-Family Dwelling, Three or More’ per the Galt Municipal Code Commercial Land Use Matrix Table 18.20-1 and is subject to a Conditional Use Permit (CUP) in the C-zone. Project entitlements include the CUP for the apartments, and Design Review for the project architecture, site design, parking, lighting, and landscaping. A lot-merger will be completed separate from this application.

The project will be determined by the Planning Commission approval at a future noticed public hearing. 

Notice of Exemption Planning Commission public hearing: December 11, 2025. Application under review. 
Tim Lewis Communities - Design Review for Liberty Ranch Village 3

An application for Design Review (Project Architecture) was received on November 14, 2024 for APN 148-1240-009 . Tim Lewis Communities is the second homebuilder in Liberty Ranch. 

Village 3 (54 lots, zoned R1C-SP)

Plan #

Stories

Square Footage

Bedrooms

Bathrooms

Additional Space

Options

1

2

2,568

3

2.5

Den

Bed 4

2 1 2,903 3 3 Den + Loft Bed 4, 5

3

2

3,095

5

3

Den + Office

Bed 6

4

2

3,224

4

4

Loft + in law suite

Bed 5

 

Refer to the Planning Commission December 12, 2024 agenda packet for more information (Village 3 is Item 5A).

Notice of Exemption Planning Commission Public Hearing: December 12, 2024 Application approved by Planning Commission on December 12, 2024.
 
Tim Lewis Communities - Design Review for Liberty Ranch Village 4

An application for Design Review (Project Architecture) was received on November 14, 2024 for APN 148-1240-010 . Tim Lewis Communities is the second homebuilder in Liberty Ranch. 

Village 4 (46 lots, zoned R1C-SP)

Plan #

Stories

Square Footage

Bedrooms

 Bathrooms

Additional Space

Options

1

2

2,568

3

 2.5

Den

Bed 4

2 1 2,903 3  3 Den + Loft Bed 4, 5

3

2

3,095

5

 3

Den + Office

Bed 6

4

2

3,224

4

 4

Loft + in law suite

Bed 5

 

Refer to the Planning Commission December 12, 2024 agenda packet for more information (Village 4 is Item 5B).

Notice of Exemption Planning Commission Public Hearing: December 12, 2024 Application approved by Planning Commission on December 12, 2024.
 
Elliott Ranch Unit 2 Design Review (R2 zoned portion)

An application for Design Review (Project Architecture) was received on September 9, 2024. Elliott Ranch is seeking approval for the R2 zoned portion of Unit 2. If approved, the design review will also apply to the future Unit 1 portion. Refer to the November 14, 2024 Planning Commission agenda packet for details. 

Unit 2 (79 lots, zoned R2)

Plan #

Stories

Square Footage

Bedrooms

Additional Features

Bathrooms

1

1

1,609

3

2

2

1

2,760

3

 

2

3

2

2,143

3

Office

2.5

4

2

2,280

4

 

3.5

 

Notice of Exemption Planning Commission Public Hearing: November 14, 2024 Application approved by Planning Commission on November 14, 2024.
 
Elliott Ranch Unit 2 Design Review (R1C zoned portion)

An application for Design Review (Project Architecture) was received on September 9, 2024. Elliott Ranch is seeking approval for the R1C zoned portion of Unit 2. If approved, the design review will also apply to the future Unit 1 portion. Refer to the November 14, 2024 Planning Commission agenda packet for details. 

Unit 2 (33 lots, zoned R1C)

Plan #

Stories

Square Footage

Bedrooms

Additional Features

Bathrooms

1

1

2,008

3

Office

2

2

1

2,292

4

 

2

3

2

2,405

4

Office

3

4

2

2,742

4

Loft and ADU or in-law suite

2.5

 

Notice of Exemption Planning Commission Public Hearing: November 14, 2024 Application approved by Planning Commission on November 14, 2024.
Home 2 Suites Hotel

Application received August 12, 2024 for Design Review (project architecture) of  a 4-story, 96-room hotel. Additional improvements include new landscaping, parking, an outdoor swimming pool, and frontage improvements.

A hotel is a land use permitted by right in the Highway Commercial zoning district. The proposed project is exempt from the California Environmental Quality Act (CEQA). Project approval will be determined by the Community Development Director.

Notice of Exemption Staff level design review. Application under review.
Elliott Ranch (aka Simmerhorn Ranch) Unit 3 TSM Extension

Elliott Homes applied for a Tentative Subdivision Map extension for Unit 3 (Veranda product) of the Elliott Ranch Project (previously known as Simmerhorn Ranch). 

The extension was requested based on the timing (both design and construction) of the project. The small lot final map for Elliott Ranch Unit 3 is not anticipated to be recorded prior to the expiration of the TSM and therefore requires a map extension

Notice of Exemption Planning Commission Public Hearing: August 8, 2024 Application approved by Planning Commission on August 8, 2024.
Twin Cities Circle

Application received (date) for an Annexation of the two parcels into Galt city limits, a General Plan Amendment, Prezone of the parcels, Conditional Use Permit to allow a convenience/liquor store, two drive-through restaurants, and one car wash, and Design Review (project architecture)

Additional project components include demolition of existing tractor dealership buildings, one 3,344 sq. ft. fuel canopy, one 3,000 sq. ft. c-store, once 2,150 sq. ft. QSR with drive-through, one 2,061 sq. ft. car wash, one 1,800 sq. ft. QSR with drive-through, and site improvements (landscape, lighting, parking, utility connections).

The project will heard by the Planning Commission at a future noticed public hearing for a recommendation, and will be determined by the City Council at a future noticed public hearing. 

 

 

IS/MND

Notice of Public Review Period and Notice of Intent

CEQA public review period: TBD 

Planning Commission Public Hearing: TBD

City Council Public Hearing: TBD

Application under review. 
Alpha Pacific Engineering & Contracting (APEC) Modular Home Manufacturer - Conditional Use Permit & Design Review

APEC applied for a Conditional Use Permit (CUP) and Design Review (DR) on February 27, 2024. The location is on a vacant parcel located on Live Oak Avenue (APN 150-0011-002). The proposed project will allow manufacturing of modules of a compete housing unit. Further details are listed below:

Phase I

  • Two (2) 60’ x 200’ steel buildings consisting of equipment to manufacture modules on a complete home unit
  • One (1) 45’ x 60’sales office building
    • Four (4) offices
    • One (1) conference room
    • One (1) breakroom
    • One (1) supply room
    • Two (2) restrooms
    • Open sales area
  • New landscaping, fencing, automatic gates, and lighting
  • New parking lot with 23 parking spaces 

Phase II

  • Two (2) 60’ x 200’ steel buildings

The proposed land use is considered a ‘Manufacturing, Minor’ per the Galt Municipal Code Industrial Land Use Matrix (Table 18.32-1), and because there are existing residential uses less than 500’ away from the proposed project, a Conditional Use Permit (CUP) is required. CUP approval will be determined by the Planning Commission at future noticed public hearing.

The project is exempt from CEQA, but shall comply with the South Sacramento Habitat Conservation Plan (SSHCP).

Notice of Exemption Staff level design review. 
Cal-Waste Solid Waste Transfer Facility Project

The City of Galt contracts with Cal-Waste Recovery Systems for waste hauling services. Cal-Waste’s facility is currently located at 175 Enterprise Court in Galt. The City of Galt has agreed to lease City-owned land at its waste water treatment plant located at 10059 Twin Cities Road to allow Cal-Waste to relocate its facility. Galt’s WWTP is in Galt City limits although it is surrounded by unincorporated Sacramento County land, and preserve areas to the north.

The proposed project includes the following:

  • 413,800 sq. ft. of building and processing areas:
    • 94,400 sq. ft. building to house transfer operations
    • 156,000 sq. ft. construction and demolition outdoor tipping and processing area
    • 41,600 sq. ft. building for organics processing (yard waste, food scraps, etc.)
    • 83,600 sq. ft. organics processing area
    • 4,200 sq. ft. office building
    • 25,000 sq. ft. building for on-site vehicle maintenance
  • Household Hazardous Waste building for public use with drive up canopy
  • Public Recycling Center
  • Scales and scale house
  • New landscaping
  • New parking lots for employee, fleet, and public vehicles
  • Above ground fuel storage tanks
  • Above ground water storage tanks and pump house

The proposed type of land use is considered a ‘Solid Waste Transfer Station’ per the Galt Municipal Code Special Purpose Land Use Matrix (Table 18.36-1) and is subject to a Conditional Use Permit (CUP) in the PQ zone. Project entitlements include a CUP for the facility use, and Design Review for the project architecture, site design, parking, lighting, and landscaping.

The project is not exempt from CEQA. An Environmental Impact Report will be prepared. Therefore, the Planning Commission will make a recommendation to the City Council for consideration of project approval at a future noticed public hearing. 

Review the February 8, 2024 Planning Commission packet for project information

Notice of Preparation (NOP)

Initial Study (IS)

CEQA Public Review Period for NOP: January 26, 2024 - February 26, 2024: Public Hearing on February 8, 2024 Application under review.
Morali Estates Subdivision - Rezone (APPLICATION WITHDRAWN)

The applicant is proposing all new architecture and floorplans to replace the architecture approved in 2005. Because the original project approval embedded the architecture in the Rezone ordinance, a Rezone application is required to process the new architecture request. The subdivision is not being rezoned, nor is the approved map going to be modified in any way. Planning Commission will make a recommendation to City Council.

Review the July 13, 2023 Planning Commission packet for project information. 

Notice of Exemption

Planning Commission Public Hearing: July 13, 2023

 

Planning Commission recommended denial to City Council by a 5-0 vote on July 13, 2023.

The applicant formally withdrew their application on July 27, 2023.

Walmart - Modification of Conditional Use Permit (CUP)

The applicant applied to modify the existing CUP to allow a 4,460 square foot addition on the east side of the building. The purpose of the expansion is to fulfill the increase of mobile pick-up and delivery orders. Compliance with the approved mitigation and monitoring plans will be reviewed in conjunction with the expansion. 

Review the April 13, 2023 Planning Commission packet for project information.

Review the May 11, 2023 Planning Commission packet for project information.

Review the June 8, 2023 Planning Commission packet for project information. 

Proposed addition determined to be in conformance with Walmart's adopted EIR. No further environmental review required. 

TBD

Planning Commission Public Workshop: April 13, 2023

Planning Commission Public Hearing: May 11, 2023

Planning Commission Public Hearing (continued from May): June 8, 2023

Approved by Planning Commission on June 8, 2023 with additional condition regarding gates.
Housing Element Site 18 Project

The proposed project includes a General Plan Amendment to re-designate a 9.9 acre project site from Commercial to High Density Residential, and a Rezone of the project site from Highway Commercial to High-Density Multiple Family (R4A). The R4A zoning designation allows for a density of between 20 and 30 dwelling units per acre. As such, while a final site plan has not yet been prepared, buildout of the proposed project is assumed to include construction of between 200 and 240 high-density residential units, as well as on-site parking and associated utility connections.

Review the February 9, 2023 Planning Commission packet for project information.

Review the March 9, 2023 Planning Commission packet for project information. 

Review the April 18, 2023 City Council agenda packet for project information.

Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study Document (December 2022)

Notice of Determination

CEQA public review period: December 7, 2022 - January 9, 2023

Planning Commission public workshop: February 9, 2023

Planning Commission public hearing: March 9, 2023

City Council public hearing: April 18, 2023

Approved by City Council on April 18, 2023.

Planning Commission recommended approval by City Council on March 9, 2023.

Lippi Ranch - General Plan Amendment, Rezone, Tentative Subdivision Map, and Design Review (Project Architecture)

Applicant applied for a GPA (from LDR to MHDR), a rezone (from R1A to R3-PD), a TSM, and Design Review on July 20, 2022. The application was introduced to the Planning Commission in the form of a public workshop on September 8, 2022. The Notice of Preparation (NOP) pubic hearing was held on April 13, 2023. A public meeting (not hearing) will be held at the September 14, 2023 Planning Commission meeting to discuss the Draft EIR. The Final EIR and project application  will be considered for a recommendation by the Planning Commission at a public hearing on November 16, 2023 with final approval decided by the City Council at a public hearing tentatively scheduled for December 19, 2023.

Meeting Dates

December 19, 2023 - City Council Meeting

November 16, 2023 - Planning Commission Special Meeting

September 14, 2023 - Planning Commission

April 13, 2023 - Planning Commission

September 8, 2022 - Planning Commission

October 26, 2023: Final EIR 

August 2023: Draft EIR Documents

Notice of Availability

DEIR

Appendix A

Appendix B

Appendix C

March 2023: Notice of Preparation (NOP) Documents

 

Notice of Public Hearing and Notice of Intent for the FEIR and Project:  November 16, 2023

CEQA public review period for Draft EIR: August 29, 2023 -  October 12, 2023: Public Meeting on September 14, 2023

CEQA public review period for NOP: March 22, 2023 - April 20, 2023: Public Hearing on April 13, 2023

Planning Commission public workshop: September 8, 2022

Approved by City Council on December 19, 2023.

Planning Commission recommended approval by City Council on November 16, 2023.

Approval Docs:

EIR Reso 

GPA Reso

TSM Reso

Rezone Ordinance

 

Veranda at Simmerhorn Ranch - Vesting Tentative Subdivision Map Revision and Design Review (Project Architecture)

Applicant applied for a 193 lot VTSM revision and Design Review on July 18, 2022 for the previously approved R3 PD-zoned portion of the Simmerhorn Ranch project. The application will be decided by the Planning Commission at the November 10, 2022 public hearing.

Review the November 10, 2022 Planning Commission packet for project details (Item 5B)

 

Addendum to the original IS/MND for the Simmerhorn Ranch / East Galt Infill Project. 

CEQA public review period: N/A

Planning Commission Public Hearing: Thursday, November 10, 2022

Approved by the Planning Commission on November 10, 2022. 
229 Oak Avenue - Tentative Parcel Map

Applicant applied for a Tentative Parcel Map on May 31, 2022 to split the existing lot at 229 Oak Avenue into two (2) parcels. The application will be decided by the Community Development Director at a noticed public hearing. 

 

Notice of Exemption

No public review for CEQA exemption.

Community Development Department Public Hearing: Thursday, July 28, 2022 at 11:00am.

Approved by the Community Development Director on July 28, 2022.
228 7th Street - Conditional Use Permit (Application withdrawn by applicant)


Summerfield at Twin Cities - Modification Request

On June 21, 2022, the applicant applied to modify one of the Conditions of Approval applied to the original project approval from 2020. Request will be decided by the Planning Commission on September 8, 2022 at a noticed public hearing.

Review the September 8, 2022 Planning Commission packet for project details.

Review the November 1, 2022 City Council agenda packet for project details.

 

Notice of Exemption

No public review for CEQA exemption.

Planning Commission Public Hearing: August 11, 2022 (rescheduled due to absence of quorum)

Planning Commission Public Hearing: September 8, 2022

City Council Public Hearing: Tuesday, November 1, 2022

Appeal filed by applicant; appeal approved by the City Council on November 1, 2022.

Request denied by Planning Commission on September 8, 2022.

Senate Bill (SB) 9

An introduction to SB 9 and the proposed ordinance that City Council must adopt in 2022. SB9 requires cities to both (a) allow any single-family lot to be split, roughly into halves, with lots as as small as 1,200 sq. ft. and (b) allow up to two single-family dwellings to be developed on each single-family residential lot - all ministerially. The topic will be introduced to Planning Commission on July 14, 2022. A resolution to recommend City Council adoption of the ordinance will be presented to Planning Commission on September 8, 2022. City Council will take action on the ordinance before the end of 2022. 

Review the July 14, 2022 Planning Commission packet for project information.

Review the September 8, 2022 Planning Commission packet for project information.

Review the October 13, 2022 Planning Commission packet for project information.

Review the February 7, 2023 City Council item for project information.

SB9 creates a new statutory exemption for an ordinance adopted to implement SB9.

No public review for CEQA exemption.

Planning Commission Public Workshop: July 14, 2022

Additional Planning Commission Public Workshop: September 8, 2022

Planning Commission Public Hearing: October 13, 2022

City Council Public Hearing: February 7, 2023

City Council approved on February 7, 2023. 

Introduction/workshop presented to Planning Commission on July 14, 2022.

10351 Live Oak Avenue - Truck Yard/Freight Terminal Conditional Use Permit & Design Review

Applicant applied for CUP and Design Review on June 7, 2022. A new 9,964 square foot metal building for semi-truck servicing is proposed along with parking and landscaping. The existing home will remain as a legal non-conforming use.

Review the October 13, 2022 Planning Commission packet for project information.

Notice of Exemption

No public review for CEQA exemption.

Planning Commission Public Hearing: October 13, 2022

Approved by the Planning Commission on October 13, 2022.
0 Live Oak Avenue - Truck Yard/Freight Terminal Conditional Use Permit & Design Review

Applicant applied for CUP and Design Review on May 20, 2022 . Project will be presented to the Planning Commission at the November 10, 2022 public hearing.

Review the November 10, 2022 Planning Commission packet for project  the information.

Notice of Exemption

No public review for CEQA exemption.

Planning Commission Public Hearing: November 10, 2022.

Approved by the Planning Commission on November 10, 2022.

Fairway Oaks Vesting Tentative Map - Extension Request

Applicant applied for a two-year map extension on May 31, 2022. There are no changes to the approved map or project. Item will be presented to the Planning Commission on July 14, 2022 at noticed public hearing.

Review the July 14, 2022 Planning Commission packet for project information. 

Notice of Exemption

No public review for CEQA exemption.

Planning Commission Public Hearing: July 14, 2022

Approved by Planning Commission on July 14, 2022.
Fairfield Residential & Commercial Development Conditional Use Permit and Design Review

Applicant applied for a CUP and Design Review for 172 market rate rental townhomes and 19,266 square feet of neighborhood oriented retail on December 21, 2021. A Conditional Use Permit is required for multi-family use in a Commercially zoned parcel.

Review the March 10, 2022 Planning Commission packet for project documents.

Notice of Exemption filed on March 10, 2022.

No public review for CEQA exemption.

Planning Commission Public Hearing: March 10, 2022

Planning Commission Public Workshop: February 10, 2022

Open House hosted by applicant: September 22, 2022 6:00-9:00pm

Approved by Planning Commission on March 10, 2022.
887 Spur Way - Tentative Parcel Map and Design Review

Applicant applied for a Tentative Parcel Map and Design Review (project architecture) at 887 Spur Way on December 6, 2021. The proposed map parcels the existing lot into four (4) parcels each inclusive of a new single-family dwelling. The application will be decided by the Community Development Director at the public hearing scheduled for November 28, 2022.

Review the November 28, 2022 Community Development Department packet for project documents. 

Notice of Exemption

No public review for CEQA exemption.

Community Development Department Public Hearing: November 28, 2022 at 10:00am.

Approved by the Community Development Director on November 28, 2022.
2021 - 2029 Housing Element

Sixth Cycle update inclusive of updated Regional Housing Needs Allocation numbers and substantive changes to State housing law in effect since adoption of the Fifth Cycle. 

Review the 2021-2029 Housing Element page for agenda packets and related documents.

Notice of Determination 

Notice of Public Review Period and Notice of Intent to Adopt a Negative Declaration for the 2021-2029 Galt Housing Element

Initial Study / Negative Declaration

CEQA public review period: July 28, 2021 - August 27, 2021 at 5:00pm

City Council Public Hearing: May 3, 2022 

City Council Public Hearing: September 7, 2021 at 6:00pm

City Council Public Hearing: August 17, 2021 at 6:00pm

Planning Commission Public Hearing: August 12, 2021 at 6:00pm

The Housing Element was certified by the California Department of Housing and Community Development on May 12, 2022.
Twin Cities Medical / Dental Office - Design Review

On May 19, 2021, the applicant applied for Design Review for a new 8,495 square foot medical/dental building to be constructed on the vacant pad south of Rite-Aid. The application will decided by the Community Development Director at a staff-level review (no Planning Commission/public hearing required).

Notice of Exemption No public review for CEQA exemption. Application under review.
Caterina Estates Subdivision

General Plan Amendment from Low Density Residential to Medium Density Residential, and Rezone from R1A to R2 to allow 61 single family dwelling units. 

Design Review (project architecture) was a separate application. Refer to the October 14, 2021 Planning Commission agenda packet for details.

Notice of Completion

Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

Appendices

CEQA public review period: September 9, 2020 - October 8, 2020 at 5:30pm

City Council Public Hearing: April 6, 2021 at 6:00pm

Planning Commission Public Hearing: January 14, 2021 at 6:00pm

City Council approved project on April 6, 2021.

Planning Commission recommended approval to City Council on January 14, 2021.

East Galt Infill Annexation / Simmerhorn Ranch

Annexation of 338 acres: 218.5 acres of non-participating properties and development of 119.5 acres for 429 single family dwelling units.

Review the September 1, 2020 City Council Agenda Packet for project documents.

Design review (project architecture) for the various units will be separate applications to be determined at  future public hearings.

Notice of Determination

Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

Appendix A - Air Quality & GHG Modeling Results

Appendix B Part 1 - Biological Resources Report

Appendix B Part 2 - Biological Resources Report

Appendix B Part 3 - Biological Resources Report

Appendix B Part 4 - Biological Resources Report

Appendix C - Climate Action Plan Checklist

Appendix D - Noise Assessment

Appendix E - Traffic Impact Study

CEQA public review period: May 29, 2020 - June 29, 2020 at 5:30pm

City Council Public Hearing: September 1, 2020 at 6:00pm

Planning Commission Public Hearing: August 13, 2020 at 6:00pm

Planning Commission Public Meeting: July 23, 2020 at 6:00pm

Initial Public Meeting: March 4, 2019 at 6:00pm

The annexation was certified by the Sacramento Local Agency Formation Commission on January 13, 2022.

City Council approved project on September 1, 2020.

Planning Commission recommended approval to City Council on August 13, 2020.

Fairway Oaks Vesting Tentative Map & County Island Annexation

Rezone of the existing Fairway Oaks Vesting Tentative Subdivision Map and addition of the annexation of the 39.5 acre County Island site.

Review the August 4, 2020 City Council Agenda Packet for project documents.

Design review (project architecture) will be a separate application to be determined at a future public hearing. 

Notice of Determination

Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

Appendix A - CalEEMod Modeling Results

Appendix B - Biological Resource Assessment

Appendix C - Climate Action Plan Checklist

Appendix D - Environmental Noise Assessment 

Appendix E - Traffic Impact Analysis

CEQA public review period: May 29, 2020 - June 29, 2020 at 5:30pm

City Council Public Hearing: August 4, 2020 at 6:00pm

Planning Commission Public Hearing: July 9, 2020 at 6:00pm

Planning Commission Public Meeting: June 25, 2020 at 6:00pm

The annexation was certified by the Sacramento Local Agency Formation Commission on April 13, 2022.

City Council approved project on August 4, 2020.

Planning Commission recommended approval to City Council on July 9, 2020.

Summerfield at Twin Cities Road Annexation

Annexation of 58 acres and development of 211 single family dwelling units.

Review the September 15, 2020 City Council Agenda Packet for project documents.

Design review (project architecture) will be a separate application to be determined at a future public hearing.

Notice of Determination 

Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

Appendix A - CalEEMod Modeling Results

Appendix B - Air Quality Mitigation Plan

Appendix C - SMAQMD Minor Projects Health Effects Tool

Appendix D - Technical Biological Report

Appendix E - Climate Action Plan Checklist

Appendix F - Environmental Noise Assessment

Appendix G - Traffic Impact Analysis

CEQA public review period: May 29, 2020 - June 29, 2020 at 5:30pm

City Council Public Hearing: September 15, 2020 at 6:00pm

Planning Commission Public Hearing: August 13, 2020 at 6:00pm

The annexation was certified by the Sacramento Local Agency Formation Commission on January 13, 2022.

City Council approved project on September 15, 2020.

Planning Commission recommended approval to City Council on August 13, 2020.

Carillion Boulevard Corridor Plan

Development of a plan that seeks to identify multimodal transportation improvements, policies, and strategies along the Carillion Boulevard corridor that could reduce greenhouse gas emissions by encouraging travel mode shifts to active transportation, reducing congestion-related automobile emissions, and reducing dependency on automotive travel for short trips. The Carillion Boulevard Corridor Plan is part of the California Energy Commission's Small Government Leadership Challenge grant that was awarded to the City of Galt in 2017.

Notice of Determination

Notice of Public Hearing, Notice of Public Review and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

Final Report Part 1: Chapters 1 - 5

Final Report Part 2: Chapters 6 - 10

Appendix A - Technical Analysis Methodologies and Policies

Appendix B - Existing Data Collection

Appendix C - Synchro Outputs

Appendix D - Sidra Outputs

Appendix E - Conceptual Layouts of Alternative 1: Road Diet with Roundabouts

Appendix F - Cost Estimates

 

CEQA public review period: March 30, 2020 - April 29, 2020 at 5:30pm

Planning Commission Public Meeting: November 12, 2020 at 6:00pm

City Council Public Meeting: August 18, 2020

Planning Commission Public Meeting: August 13, 2020 at 6:00pm

Planning Commission Public Meeting: July 9, 2020 at 6:00pm

Planning Commission Public Meeting: May 9, 2019 at 6:00pm

Initial Public Meeting: March 25, 2019 at 6:00pm

 
Cardoso II Subdivision

Rezone from R1A and Open Space to  R1C to allow 87 single family dwelling units. 

Design Review (project architecture) was a separate application. Refer to the July 8, 2021 Planning Commission agenda packet for project documents.

Notice of Determination

Notice of Public Hearing, Notice of Public Review Period and Notice of Intent to Adopt a Mitigated Negative Declaration

Initial Study / Mitigated Negative Declaration

CEQA public review period: February 3, 2020 - March 4, 2020 at 5:30pm

City Council Public Hearing: April 21, 2020

Planning Commission Public Hearing: March 12, 2020 at 6:00pm

City Council approved project on April 21, 2020.

Planning Commission recommended approval to City Council on March 12, 2020.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer